Date

  • 23-10-2017

    Focast Châteaubriant joins the Focast Holding

  • 18-10-2017

    The capital of Anglo Belgian Corporation (ABC) is raised to 70 MEUR

  • 29-06-2017

    Acquisition of 47.500 shares of FOCAST HOLDING

  • 28-06-2017

    Opening Elais Business Center in Pointe Noire

  • 30-03-2017

    Rwandamotor´s 50th anniversary

  • 21-10-2016

    Capital increase of Anglo Belgian Corporation (ABC)

  • 22-09-2016

    Capital increase Ogepar s.a.

  • 17-05-2016

    Decision in an appeal on the 43% of Focast Holding

  • 09-05-2016

    ABC welcomes Ministers De Croo

  • 05-04-2016

    Subsidiary in Dunkerque

  • 14-03-2016

    LUITPOLDHÜTTE welcomes state minister of finance and state secretary from Bavaria

  • 04-01-2016

    Luitpolhütte GmbH

  • 30-07-2015

    Acquisition of 47.500 shares FOCAST HOLDING

  • 11-06-2014

    Elite Fashion show - Hotel ELAIS - Pointe Noire

  • 06-06-2014

    Share purchase agreement in the Soras Group ltd.

  • 06-06-2014

    RWANDAMOTOR - Kigali

  • 19-12-2013

    Arboretum of Bujumbura

  • 29-11-2013

    Mergers by absorption: BURUNDIMOTOR and CONGO MOTORS

  • 27-09-2013

    "MOTEURS MOES SA" IS NOW "ABC CONTRACTING SA"

  • 05-07-2013

    KBB celebrates 60 years of turbocharger production in Bannewitz

  • 08-01-2013

    Reduction of Capital of ELAIS IMMO bvba

  • 27-10-2012

    ABC celebrates its 100-year anniversary and launches the DL36 engine range

  • 01-09-2012

    OGEPAR opens a subsidiary in Shanghai

  • 13-08-2012

    ABC and KBB exhibit at the SMM fair 2012 in Hamburg

  • 05-07-2012

    Absorption GENTSE METAALWERKEN in PEGARD

  • 26-06-2012

    IVOIREMOTOR

  • 15-03-2012

    Inauguration of the second phase of the renovation (Hotel ELAIS Pointe-Noire)

News

Inauguration fase 1 of the renovation plan in hotel ELAIS (Pointe-Noire)

On September 15th 2009, hotel ELAIS inaugurated the results of the first phase of the renovation plan: excellent drainage, waterproof units, the construction of a new power plant (with two new gensets) and a well for self-support of running water. Approximately 100 rooms surrounding the swimming pool have been renovated and refurbished from scratch: brand-new electricity, plumbing and tiling. They now definitely meet the high standards of a four-star hotel. This first considerable phase costed about 5,5 million Euro. The second phase will deal with the public areas (such as the hotel lobby, meeting rooms, boutiques,…) and is planned for the second semester of 2010.

immobilier immobilier immobilier